Master Plan
1. TRIVANDRUM MASTER PLAN-SANCTIONED-GAZETTE NOTIFICATION 19.07.24 (pdf)
The Gazette notification of the Sanctioned Master Plan. The date of Gazette notification is the date of coming into force of the Master Plan.
2. Sanctioned Master Plan Government Order (pdf)- G.O. (Ms) No. 85/2024/LSGD dated 04-07-2024
The Government order regarding sanctioning of the Master Plan.
3. Sanctioned Master Plan-Chapter 36- Zoning regulation (pdf)
The Zoning regulation for the Proposed land use. Also available within Volume II of the report. Provided for ready reference.
4. Sanctioned Master Plan-Road list (pdf)
The details regarding road widening proposed in the Master Plan. Also available within Volume II of the report. Provided for ready reference.
5. Master Plan Details
Folders "MASTER PLAN-MODULE MAPS-Modules A-E", "MASTER PLAN-MODULE MAPS-Modules C2 1-15", "MASTER PLAN-MODULE MAPS-Modules C3 1-2", "MASTER PLAN-MODULE MAPS-Modules D 1-25", "MASTER PLAN-MODULE MAPS-Modules D 26-50", "MASTER PLAN-MODULE MAPS-Modules D 51-73", includes the survey number based Proposed land use map maps for each specific area within the Corporation. As mentioned in Sl.no. 5, after identifying the module/sub module information for a specific plot, the concerned module/sub-module folders have to checked for viewing the individual specific maps.
There are a total of 116 maps for the Sanctioned Master Plan.
For identifying the zone of a survey number, the following general strategy is proposed. Gather the village, block, survey/resurvey number, approximate location of the plot. Refer the Module Index map and with the approximate location identify the concerned module/sub module. Check the concerned folder for the specific module/sub module map. Also check the block maps folder, if the block map for the concerned village is available. identify the approximate location of the block. Based on the location of the block, identify the survey/resurvey number in the specific module/sub module map.
LSGD Planning Website – Click Here
- 15737 views